find us on ariba
pcall us - 989.496.2440

Fishing Platforms

Mio Fishing Platform

Gerace self-performed all work:

Installation of a fishing platform on the right downstream corner of the spillway retaining wall. Work included demolishing the upper portion of the existing retaining wall, utilizing our divers to install sheet pile on the apron and drove the remaining outside the apron foot print, installation of Gerace fabricated waler and tie back system, form and pour concrete and the installation of Gerace fabricated ADA railing.

Installation of core wall sheet pile. Installed sheeting in front of core wall on the left and right side of the power house and spillway. Concrete was then poured between the sheet pile and existing core wall.

LOCATION
Mio, MI

[back to dams