Mansfield Dam Variable Flow Floodgate Replacement
Gerace Construction was awarded the contract to furnish and install a new jet-flow gate at the 70 year old Mansfield Dam. This project consisted of removal of the existing Paradox Gate, reworking the penstock, installation of the Jet Flow Gate, installing the hydraulic system, and testing/commissioning of the entire system.
LOCATION
Austin, TXDURATION
September 2009 – May 2010