Dam Gate Rehabilitation

Headworks Spillgate and Service Bridge Replacement

Gerace Construction Installed four 47'-0" wide hydraulic crest gates in the existing spillway. The work included cofferdams, mass concrete demolition, rock anchors, structural concrete, embedded concrete heating system, rubplate installation, hydraulic system installation, and crest gate install. Additional to the contract we provided new trash rakes for the intake structure along with new guides and sills.

LOCATION
Rochester, NY

DURATION
October 2003 – March 2006
[back to dams