Distribution Warehouse
Gerace had the challenge of removing existing expansive soils and replacing it with approximately 150,000 cubic yards of engineered fill on the 14 acre site. We then had the task of constructing the 120,000 square foot pre-engineered metal building / Tilt wall structure in less than 6 months. The building consists of 115,000 square feet of distribution area and a 5,000 square foot Office. Other aspects of this project include 2,800 lineal feet of security fence, 7 acres of landscaping and 180,000 square feet of paving.
LOCATION
San Antonio, TXDURATION
January 2008 – September 2008