find us on ariba
pcall us - 989.496.2440

Steel Fabrication

Hodenpyl Cofferdam

Design, fabricate and install cofferdam in front of intake. Water depth was 60'-0" deep in location of the cofferdam. Removal and disposal of (6) existing caterpillar roller gates. Construct new sealing surfaces / gate guides for new gates. Design, fabricate and install (6) new gates.

LOCATION
Mesick, MI

[back to steel fabrication