Pre-Engineered Metal Buildings Installation 2025

This Construction project in St. Louis, Michigan for Consumers Energy and Miron Constuction in 2024/2025 focused on the Five Building Sand Separation Project. This initiative aimed to enhance operational efficiency and environmental compliance by improving sand separation processes at the facility.

Project Highlights:

  1. Construction of Five Specialized Buildings:

    • Each building was designed to support different stages of the sand separation process, including filtration, drying, and storage.

    • Structures incorporated durable materials to withstand industrial wear and tear.

    Operational Efficiency & Safety:

    • Modern layouts and optimized workflows streamlined the sand separation process, enhancing productivity.

    • Safety features, such as proper ventilation, dust control, and reinforced structures, ensured worker protection.

Previous
Previous

MECHANICAL: Evanston Illinois Water Intake Replacement

Next
Next

HYDRO: Clarion, Pennsylvania: Replacement of 8 Tainter Gates and 15 Platforms